Depth of pile /Pitch 1 = 20/ 1 = 201 numbers Now determine the total cutting length as follow Circumference of one spiral x Numbers of spirals = x 201 = meter So for 20 meters pile meter long spiral should be cut The quantity of steel will be calculated as follow We know for 1 running meter the weight of
Get PriceMaximum percentage of steel = % ∴ Quantity of steel = /100 x 1 = m³ Weight of steel = x 7850 = kg
Get PricePile Cages Pile Cage 4 x Main Bars 3Mtr As well as the material composition of rebar its overall weight per linear metre is also influenced by its diameter and by the surface deformation or patterning on the particular type of rebar length or mesh sheet Rebar Diameter Weight in Kg/m theoretical 6mm /m 8mm /m
Get PriceThe actual energy delivered by hammer per blow in Kilogram centimeter WD = Driven weights in Kilogram Note The cut off method shall be used in a way that does not damage the portion of the pile to be left In place nor the pile of piles shall be embedded in the concrete footing as shown on the piles
Get PriceJune 22 2024 Piles with a diameter of less than 30 cm which are accompanied by steel reinforcement and grout injection are referred to as micropile underpinning also known as minipiles pin piles needle piles and root pile construction There are two main approaches to ground improvement
Get PriceCover for pile cap = 75 mm Piles = 75 m Rebar weight of the Pile Main bars Nos = 8 Dia = 16 mm ribbed bars unit weight kg/m We used the following formula to find out the cutting lenght { Pile Depth Pile Cap Depth Pile Cover Pile Cap Cover Development Length} By putting all the values we get the following
Get PriceThe reinforcement segments for 1200 mm diameter piles will be connected together using the couplers fixed to the end staggered at a minimum clear distance of 70 cm c/c to receive the second segment pile cage The helical reinforcement / rings shall be fixed in place after connecting the two segments of reinforcement for 1200 mm diameter piles
Get PriceCement/grout mix per batch 2 bags of OPC cement = 100 kg 55 liters of water = 55 kg Water/cement ratio = For Secondary Piles A Reinforcement Cage Needs to be Placed In preparation for placing the cage the pile toe must be thoroughly cleaned using a cleaning bucket The reinforcement cages must be built in advance in
Get PricePILE FOUNDATION DESIGN AS PER IS 2911 2024 The pile code consists of four parts They are Part 1 Concrete piles Part 2 Timber Friction Piles = D where D is dia of piles Reinforcement Longitudinal reinforcement Main rod Minimum 6Nos bars shall be used Concrete Grade Minimum M25 The minimum cement content shall be 400 kg/m3
Get PriceAn important part of bored pile construction is the cleaning and inspection of the bottom of the hole prior to the placement of reinforcement and concrete To achieve cleaning once drilling is complete a cleanout bucket is typically used to remove any material unsuitable for end bearing support Weight per Contact Plate assembly in air 6
Get PriceIntroduction of Steel Price Per Kg Today Steel is the main element needed for constructing structures islands and other structures The price of a sword alters regularly Due to the aureole epidemic the rate of Construction accouterments is increasing daily and steel is the spine of any structure And it s additional special than that
Get PriceMutu Beton saat umur 28 hari adalah 500 kg/m2 untuk flat Sheet pile dan 500 kg/cm2 700 kg/cm2 untuk concrete corrugated Sheet Pile Specified concrete compressive strenght at 28 days K=700 kg/cm2 Steel reinforcement fy=4000 Kg/cm2 fy=2400 Kg/cm2 Reinforcement of prestress 416 Strand Tags Gallery Product
Get PriceDepending on what code you are using in Australia we are required to provide longitudinal steel for cast in place piles and for any portion of the pile which protrudes above ground I was recently pulled up by my local department of transportion for provided cast in place piles for a bridge pier of a overpass with longitudinal
Get PriceHow to Steel Bar Calculation Weight Here Steel Weight Caution = Area of Bars X Length of Bar X Density of Steel For Square Shape Weight of Steel Bar = Area of Bars X Height of Bar X Density of Steel Area of Bars = Lenght X Width Height of Bar = as per the required length Density of Steel = 7850 kg/m 3 Example 10 mm Square Bar Hight = 1 m Area of Bars = 10 x 10 = 100 mm = 100x 10 6 m 2
Get PriceTypical examples A pile cap could contain 400kg/m3 A heavy duty industrial slab or structure could contain 200kg 400kg/m3 A footpath could contain 40kg/m3 all depends on the design but numbers
Get PriceAn estimated trillion US dollars per year worldwide is expected to be spent on structural repairs due to corrosion 300 and 400 kg/m 3 Rapid chloride permeability RCP and nonsteady state migration NSSM tests were used to evaluate the chloride transport behavior 2024 and repairing piers or piles damaged by steel
Get Price3 Weight of Bar Per meter Length in kg/m The weight per length of the reinforcement bars is expressed as Weight per meter = D²/ 162 For example if the diameter of the reinforcement bar is 6mm then Weight per meter = 6²/ 162 = kg/m how to prepare bar bending schedule Note you should keep the value of D in mm and the answer
Get PriceUnimate Pile Breaker is an efficient economical clean and advanced system for cutting concrete outcrops and foundation piles Thanks to this way of working no cracks and damage will be caused to the pile and reinforcement Weight kg Required Excavator Weight t Height Of Single Crush Pile mm 5 400 500 1905 20 200 6 500 600
Get PriceRebar price list for structural steel materials such as Wide Flange I beams C channels angle bars flat bars steel plates and other steel materials PRICE PER UNIT Reinforcement Bar Rebar Price Rebar Price Grade 60 20mm Diameter meters 705 Rebar Grade 60 16mm Diameter Sheet Pile Price Sheet Piles Type 2 400mm W X
Get PricePipe Weight Calculator The below formula can be used to determine the weight per foot for any size of pipe with any wall thickness WT/FT = OD WT x WT x
Get PriceNorth west stockist and nationwide cut bent fabric specialists We stock standard size fabric reinforcement sheets and offer a distribution service around the North West from our depot in Wigan We also specialise in the manufacture of cut and bent fabric reinforcement from standard sheets to BS8666 to suit customer requirements
Get PriceApr 30 2021From experimental results it was understood that when piles installed as a reinforcing member in soil slope the installation improves the shear strength of unstable soil minimizes slope movement and increases the factor of safety of the slope thus improving the safety of slope against landslide hazards Keywords Slope reinforcement Pile LDSB
Get Pricecolumn and roof beams kg/m3 roof slabs 240mm thick kg/m3 small bases below3m3 kg/m3 grade beams kg/m3 medium bases between10 20m3 kg/m3 retaining wall kg/m3 ground floor slab 240mm thick kg/m3 area paving 100mm thick kg/m3 duct bank kg/m3 sleeper pedestals kg/m3 building …
Get PricePile Cap Concrete m3 x Ratio = Rebar Tonnes % ratio Base Slab Concrete m3 x Ratio = Rebar Tonnes % ratio Suspended Slab Concrete m3 x Ratio = Rebar Tonnes % ratio Walls Concrete m3 x Ratio = Rebar Tonnes % ratio ‹ Reinforcement up Staircase Reinforcement
Get Price9 kg to 13 kg of binding wire is required for tie of 1000 kg or 1 ton steel as per IS Code 12 kg to 13 kg binding wire is required for 1000 kg or 1 ton of 8mm 16mm steel rebar 7 kg to 9 kg binding wire is required for 1000 kg or 1 ton of 16mm 32mm steel rebar More the diameter of the rebar lesser the requirement of binding wire
Get PriceOF WELL AND PILE FOUNDATIONS 1985 WELL AND PILE FOUNDATION CODE ADOPTED 1941 REPRINTED 2024 may be adopted as per IS 2950 In case the well is found on rock reinforcement of 72 kg/m 3 excluding bond ii Buoyancy iii Dead load ofsuperstructure substructure
Get PriceTotal Weight of Steel = Weight of Main Bars Weight of Rings = 49 = Kg For More Detail Please see the above video Advantages of Bar Bending Schedule Bar bending schedule provides details of reinforcement cutting and bending length
Get PriceReinforcement Bar Conversion Table When in measurement of the reinforcement bar for the structural work the reinforcement bar conversion table will be handy for quantity surveyor or rebar scheduler to measure the kg/m in summary In general the reinforcement bars or rebars specified by Singapore Engineer is in Grade 460 to 500
Get PriceDramix Parking Straume JP Group 3700 m 2 cast November 2024 in Viborg 150 mm restraint floor with calculated crack wk = 0 2 mm Mesh 8#100 in top and 20 kg/m 3 Dramix 4D 65/60BG Elopac 1600 m 2 cast in December 2024 in Randers 150 mm restraint floor with calculated crack wk = 0 3 mm Mesh 8#150 in top and 30 kg/m 3 Dramix 4D 65/60BG 50 000 m 2 combined reinforcement for crack control in Denmark
Get PriceThe reinforcement provided for other purpose can also act as effective ties if continuity and adequate anchorage for rebar of ties have been provided Fuller discussion is included in Section 14 of this Manual Wind loads for design should be taken from Code of Practice on Wind Effects in Hong Kong 2024
Get PriceIncredible has successfully built lots of crushing plants, grinding plants and metal ore dressing plants for our customers.
With over 30 years of experience, we become a renowned manufacturer in the stone crushing and mineral grinding industry. Headquartered in Shanghai, China, our expansive factory spans over 120 hectares, empowering us to cater to the production demands of global customers.